High Rise Edge of Wall and Slab Protection at Apartment Units

Vertical Edge of Wall Test 120 mins With no protection at this construction detail between occupied accommodation units and with limited access, a fire rated ceramic curtain installation was proposed; this detail was then fire tested and found to perform as required for 120 minutes. The resulting method was certified for use and installed on site with minimal disruption to the client’s occupants and internal décor.

 

If you are looking for a certified and cost effective site specific solution and need assistance,
please contact our technical department at any time by emailing technical@rlewisfire.com

Compartment and Purlin Protection 120 mins (vertical edge of wall test detail)